First and foremost you should check the projector s manual and identify the ideal height position of the.
How to hang projector screen on the wall.
Attach one side of the projector screen to the screw in the wall and then raise the other side to be level with the floor using a bubble level tool to make sure that it is level.
If there are no joists available in the location where you.
Third take down the frame and attach the actual screen to the frame.
Attach the cleat to the projector screen frame measure down off of the top of the frame about 12 16 and make a mark.
How to hang a projector screen on the wall first step.
Lag bolts aka lag screws are fasteners with flat hexagonal heads and threaded cylindrical shafts.
You should drag the stud detector over the wall upon which.
One side attaches to the wall the other permanently affixed to the projector screen frame.
We will require a stud detector for this step.
To use a stud finder you simply run it along the wall until its indicator tells you that it s hit a stud.
Fourth re mount the frame now with screen attached and double check horizontal level and plumb.
It depends on what you decide to use.
Measure on the wall the distance between the screen s bracket connectors.
Simply screw a 3 long screw in to the wall at your desired height and preferably in to a stud in the wall.
Insert the hook screw or the toggle bolt with wall hooks in the hole.
Lift the screen and attach the bracket connectors to.